A main line insulation piercing connector must accommodate both the feeder and the tap. A model that accepts a 150 mm² main does not necessarily accept a 150 mm² branch. That distinction matters when an LV-ABC feeder supplies another distribution cable, equipment, or a local distribution box.
This guide focuses on the conductor-window boundaries of CONWELL’s KW2-95, KW2-150, KW3-95, and KW4-150. For the wider selection process, refer to the general LV-ABC insulation piercing connector guide. Here, the question is narrower: when does a larger main require a different tap window, and what evidence is needed before approving the shortlisted model?
The following values are published on CONWELL’s product pages and IPC category listings, checked on 20 October 2026. They provide a dimensional shortlist, not approval for every conductor material, insulation construction, or load within those nominal cross-sections.
| Model | Published main range, mm² | Published branch range, mm² | Published torque, Nm | Important boundary |
|---|---|---|---|---|
| KW2-95 | 16–95 | 4–50 | 20 | Neither a main above 95 nor a branch above 50 is within this window. |
| KW2-150 | 50–150 | 6–50 | 20 | The larger main window does not increase the maximum branch size. |
| KW3-95 | 25–95 | 25–95 | 20 | A wider branch window, but the main still stops at 95. |
| KW4-150 | 35–150 | 35–150 | 26 | Accepts larger nominal branches, but excludes branches below 35. |
Use the insulation piercing connector range to check the exact reference and version. The 95 or 150 in a model name is not a current rating, and suffix variants should not inherit another version’s specifications.

KW2-95 product example from CONWELL’s website. Its main and tap markings identify different conductor windows; they do not establish suitability for another model or cable construction.
When the main moves beyond 95 mm² but the branch remains within 6–50 mm², the published window of KW2-150 is relevant for review. Its larger-main connector specifications still limit the branch to 50 mm². Moving from KW2-95 to this model is not a solution for a 70 mm² tap.
If the branch exceeds 50 mm², examine a different branch window. KW3-95 covers nominal main and branch sections of 25–95 mm². KW4-150 extends both windows to 150 mm² but has a 35 mm² lower limit. The larger-branch connector specifications therefore describe a different application boundary, not a universal upgrade.
Consider three window-only examples:
These examples are dimensional screening only. They do not confirm a particular copper/aluminum pairing, insulation thickness, operating current, or utility approval.
“Heavy feeder tap” describes the project, not a standardized connector rating. Record expected branch current, duty cycle, ambient conditions, and the protective device. Have the designer confirm conductor capacity and the relevant fault conditions separately from connector selection.
CONWELL lists a nominal current of 157 A for both KW2-95 and KW2-150, despite their different main windows. It lists 316 A for KW4-150. These published figures should trigger a request for the applicable rating basis and test conditions; they are not a ready-made breaker selection table or permission to load every conductor combination to that current.
Ask which materials and size combinations the electrical tests cover, including relevant thermal and fault-performance evidence required by the project. Do not infer KW3-95’s current rating from its torque or section range. Nor should a laboratory underwater withstand value be treated as the operating voltage.
Specify main and branch materials independently, together with conductor construction, insulation type, thickness, and outside diameter. Request written compatibility for the actual pairing. A generic choice of contact-tooth metals is not proof that every offered configuration suits every copper/aluminum connection.
Keep the complete model suffix in the BOM and quotation. Versions intended for bare mains, insulated mains, or a different branch arrangement must not be substituted by dropping a suffix. Confirm the operating voltage and intended cable system on the current model-specific documents.
The torque column identifies a published installation-control parameter. It is not a procedure for working on an energized feeder. Require the correct instructions, tool interface, conductor positioning requirements, and acceptance checks for the exact product. Do not transfer the 20 Nm value to KW4-150 or compensate for an out-of-range cable by tightening harder.
Qualified crews must follow the utility’s approved work method and site safety controls. A shear-head design, insulated body, or catalog installation claim does not by itself authorize live installation.

Overhead installation context from CONWELL’s website. This image does not identify a particular IPC model or demonstrate an approved feeder-tap arrangement.
Does KW2-150 accept a 150 mm² branch?
No. Its published branch window is 6–50 mm²; 150 mm² is the upper limit of its main window. Review a different connector where the branch exceeds that range.
Can KW4-150 replace KW2-150 on every 150 mm² main?
No. The branch matters: KW4-150’s published lower branch limit is 35 mm². A smaller branch can exclude it even when the main fits.
If both KW3-95 and KW4-150 fit the sections, is either acceptable?
Not yet. Confirm the cable materials and construction, electrical duty, applicable evidence, physical fit, and installation requirements. Overlapping windows establish candidates, not interchangeability.
Can the IPC also support the branch cable mechanically?
Do not assume it is an anchoring fitting. Provide the branch routing and support arrangement and obtain the required mechanical provisions from the project designer.
For a main line insulation piercing connector proposal, submit:
Send CONWELL your main and branch cable data, load, and quantities. Ask the supplier to confirm both conductor windows and the exact configuration’s ratings before accepting the proposed model.
Written by the CONWELL international trade team, led by Matt, General Manager, who brings more than 20 years of international trade experience and deep expertise in the power fittings industry. He also leads CONWELL's CNAS laboratory, overseeing product testing, quality control, and technical compliance.
TEL: +86-158-5877-7327
No. 16, Waixi Road, Lingang Economic Development Zone, Yueqing Bay Port Area, Yueqing City, Wenzhou City, Zhejiang Province, China
COPYRIGHT © 2025 ZHEJIANG KEYI ELECTRIC GROUP CO., LTD. ALL RIGHTS RESERVED.
We value your privacy
We use cookies to enhance your browsing experience, serve personalised ads or content, and analyse our traffic. By clicking "Accept All", you consent to our use of cookies.
Customise Consent Preferences
We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.
The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. Show more
Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.
Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.
Performance cookies are used to understand and analyse the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Advertisement cookies are used to provide visitors with customised advertisements based on the pages you visited previously and to analyse the effectiveness of the ad campaigns.