When specifying a suspension clamp for ABC cable at an intermediate support, treat ES1500A as an exact assembly reference rather than a generic “1500” fitting. CONWELL’s public ES1500A listing gives a 25–95 mm² cross-section range and a 12 kN breaking load. Those two fields do not establish the permitted messenger construction, route angle, or working load of a complete pole attachment.

This application check sheet is for reviewing ES1500A at a proposed straight or small-angle LV-ABC support. It does not assign an allowable angle or approve the model for a particular cable. Obtain the current model drawing and application limits before releasing a project order.

The ES1500A Application Record: What Is Confirmed?

The model appears in CONWELL’s ABC suspension clamp range. Keep the complete suffix on the inquiry: information for ES1500, PS1500, or another supplier’s similarly named assembly is not automatically ES1500A evidence.

Check Public ES1500A information Required confirmation for the project
Size 25–95 mm² cross-section. Identify the member to which that range applies, its material and construction, and the permitted outside-diameter window.
Mechanical value 12 kN, labeled breaking load. Identify the tested components, loading direction, failure criterion, and permitted service duty.
Messenger compatibility Not established by the two published fields above. Confirm suitability for the proposed insulated neutral messenger and its insulation; do not assume approval for bare messengers or whole bundles.
Route geometry No verified model-specific angle limit available for this review. Obtain the allowable deviation, its definition, direction relative to the pole, and any required assembly configuration.
Supply and mounting The model name alone does not define the supplied hardware set. Confirm clamp, link, bracket, attachment details, and the exact parts included in the quotation.

Check the Messenger, Not Just the Cable Designation

For an insulated-messenger suspension proposal, mark the load-bearing neutral on the cable cross-section. Record its conductor material, nominal section, strand construction, insulation, and finished outside diameter. The phase-core section and overall bundle diameter do not replace those messenger fields.

Ask CONWELL to identify the ES1500A gripping surface and confirm that it accepts that specific messenger without unacceptable slip or insulation damage. If the route uses a self-supporting bundle without a dedicated load-bearing messenger, stop this model-based review and request the appropriate documented cable-support arrangement.

A different CONWELL suspension design, PSP25-120, shown only as a structural contrast. This is not an ES1500A photograph; a broad bundle-support opening must not be treated as evidence of messenger-clamp interchangeability.

Send the Pole Plan With the Angle

A quotation saying “small angle” leaves the application unresolved. Draw the incoming and outgoing spans in plan view, show the pole face and bracket orientation, and define whether the stated angle is route deviation or the included angle between spans. Add the elevation profile when support heights differ.

Ask whether the model’s limit distinguishes a pull toward the pole from a pull away from it. The link’s available movement and the cable’s clearance from the pole can change with direction. Do not use an angle quoted for another ES1500-style product as a CONWELL ES1500A limit.

For a position outside the confirmed suspension envelope, the line designer should specify the appropriate strain or other engineered support arrangement. Adding another clamp, changing a link, or fitting a different bracket requires an approved configuration; it is not a way to extend the model’s angle limit by assumption.

Why 12 kN Does Not Complete the Load Check

Request the support reactions for the actual adjacent spans and required load cases. Cable weight, span inequality, route deviation, wind or ice where applicable, and longitudinal imbalance affect different directions of loading. A straight-line vertical-load check cannot approve a turning support by itself.

Compare those demands with documented application limits for the complete offered assembly. Do not convert the published breaking value into an allowable load using an assumed universal factor, or interpret the model number as a load unit. Also establish whether any connecting element has an intentional release function before proposing a stronger replacement.

Approve the Link-to-Bracket-to-Pole Interface

Review the selected pole brackets for suspension assemblies against the ES1500A drawing. A bracket carrying a larger catalogue load figure is not automatically compatible: the opening, bearing surface, retention, articulation, load direction, and stand-off all matter.

Pole-interface context from the CONWELL website. The photograph is not an ES1500A installation example and does not establish an approved bracket, fastening method, or clearance.

For each pole type, identify the material, dimensions at the attachment, available bolt holes or permitted banding arrangement, and the network owner’s mounting requirements. Check the clamp and messenger movement envelope as well as the bracket’s static fit. Apply the pole and fixing-system limits to the actual load direction, not just to the clamp’s headline value.

Use the aerial cable accessories solution overview to coordinate adjacent fittings, but record the ES1500A assembly separately in the bill of materials. Do not let a general accessories description replace the model-specific application drawing.

FAQ: ES1500A at an Intermediate ABC Support

Does a 70 mm² cable automatically fit the ES1500A range?

No. Identify whether 70 mm² describes a phase conductor, the messenger, or another cable designation. Confirm the supported member and its finished diameter against the model’s approved construction.

Can ES1500A be approved at a 30° route deviation?

Not from the public size and breaking-load fields alone. Submit the defined angle and pole orientation and obtain the manufacturer’s applicable limit and assembly requirements.

Is the published 12 kN the working load of the complete pole installation?

No. It is labeled breaking load. Confirm the test scope and service limits, then assess the link, bracket, fixing system, and pole under the required project load cases.

Can an existing bracket be retained during a retrofit?

Only after its identity, condition, interface, and load suitability have been assessed for the proposed assembly. Physical engagement alone does not establish compatibility.

Request an ES1500A Application Confirmation

Before ordering a suspension clamp for ABC cable, send CONWELL your messenger and suspension-point requirements: cable drawing, messenger material and section, outside diameter and insulation, adjacent span information, defined route angle, support load cases, pole details, existing interface photographs, and quantity.

Ask for the current ES1500A drawing, confirmed messenger window, allowable angle conditions, mechanical application limits, and supplied-parts list. Keep any missing field open in the technical review; the published size range and breaking load are a starting point, not an application approval.

About the author

Written by the CONWELL international trade team, led by Matt, General Manager, who brings more than 20 years of international trade experience and deep expertise in the power fittings industry. He also leads CONWELL's CNAS laboratory, overseeing product testing, quality control, and technical compliance.

Last reviewed: 2026-09-11 12:00 · Reviewed by CONWELL engineering team

Table of Contents

Inquire Now

*We respect your privacy. When you submit your contact information, we agree to only contact you in accordance with our Privacy Policy.

We value your privacy

We use cookies to enhance your browsing experience, serve personalised ads or content, and analyse our traffic. By clicking "Accept All", you consent to our use of cookies.

Get a Quote